高考论坛

 找回密码
 立即注册
查看: 114|回复: 0

2012年高考英语阅读理解习题123

[复制链接]

11万

主题

11万

帖子

33万

积分

论坛元老

Rank: 8Rank: 8

积分
338765
发表于 2016-7-24 09:34:10 | 显示全部楼层 |阅读模式
  A few years ago, Paul Gerner began to gather a group of architects in Las vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning . ”I think half of then fell off their chairs,” Gerner says.
          Gerner manages school facilities (设施)for Clark county, Nevada, a district roughly the size of Massachusetts. By 2018, 143, 000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (样品) ; They plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.
          Green schools are appearing all over , but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. ”One of the biggest challenges is getting the right site orientation(朝向), ” Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”
          Surprisingly, the man responsible for one of re most progressive green-design competitions has doubts about ideas of eco-friendly buildings. ”I don’t believe in the new green religion,” Gerner says. ”Gerner says.”Some of the building technologies that you get are impractical. I’m interested in those that work. ”But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. ”You never know what’s going to start the interest of a child to study math and science,”he says.
          63.How did the architects react to Garner’s design requirements?
          A. They lost balance in excitement.
          B. they showed strong disbelief.
          C. they expressed little interest.
          D. they burst into cheers.
          64.Which order of steps is followed in carrying out the project?
          A. Assessment-Prototype-Design-Construction.
          B. Assessment-Design-Prototype-Construction.
          C. Design-Assessment-Prototype-Construction.
          D. Design-Prototype-Assessment-Construction.
          65.What makes it difficult to build green schools in Clark County?
          A. The large size.
          B. Limited facilities.
          C. The desert climate.
          D. Poor natural resources.
          66.What does Gerner think of the ideas of green schools?
          A. They are questionable.
          B. They are out of date.
          C. They are advanced.
          D. They are practical.
          答案 63.B 64.D 65.C 66.A
         
            编辑推荐》》文综冲刺专题  2012高考作文预测  高考全年备考手册  报志愿200问  英语高分作文模板  新东方助你冲刺高考60天
            更多高考资讯及备考资料在》》新东方网高考频道
            更多新东方学校高考课程在》》报班通道
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

小黑屋|手机版|Archiver|新都网

GMT+8, 2025-2-25 11:57 , Processed in 0.067939 second(s), 7 queries , WinCache On.

Powered by Discuz! X3.4

© 2001-2017 Comsenz Inc.

快速回复 返回顶部 返回列表